$KIN $0.00000101 ▼ 5.85% Upgrades paid in KIN How to get KIN $KIN on X KIN Telegram

Verify your link back — activate links instantly

Added a link to submitpr.org on your website? Enter it below. We check it automatically and switch on every link in your press release — no Telegram message needed.

Step 1. Add this link to your website

Paste it in your footer, sidebar, “About”, press or blog page — any public page on your site works.

<a href="https://submitpr.org">Press Release by SubmitPR Free</a>

More styles (badge, attribution) on the link back instructions page.

Step 2. Verify it here

Must be publicly visible (no login). The link must be a normal clickable link to https://submitpr.org.
Your link is checked automatically. Every time your press release is loaded we re-check, in the background, that your link back is still there. If you remove it, the activated links — a premium feature — are removed from your press release. Want links that stay active without a link back? Upgrade with KIN.